Case study

Four Seasons Hotel at The Surf Club

Custom millwork in Surfside: hand-stained doors with fabric panels, cabana dry bars and painted serving stations.

The job

At the Four Seasons Hotel at The Surf Club in Surfside, we built three kinds of custom millwork: hand-stained custom doors with inset fabric panels framed in metallic trim, private dry bars for the hotel's cabanas, and sculpted, rounded serving stations finished in paint for the hotel's restaurant.

The work was designed, fabricated and built in the USA in our Fort Lauderdale shop, and installed by our own crew. Lead time for custom work is 8–12 weeks from approved drawings. The photo at the top of this page shows a machine in our Fort Lauderdale mill, not the hotel.

For more planning detail, see our Four Seasons Surfside millwork guide. We also build restaurant and hotel millwork for other hospitality projects — start on our restaurant and hotel millwork page or our commercial millwork page.

Project facts

LocationSurfside
BuiltIn our own Fort Lauderdale mill
ScopeHand-stained custom doors, cabana dry bars and restaurant serving stations
Scope

What we built

  • Custom doors. Hand-stained custom doors with inset fabric panels framed in metallic trim.
  • Cabana dry bars. Private dry bars built for the hotel's cabanas.
  • Restaurant serving stations. Sculpted, rounded serving stations finished in paint for the hotel's restaurant.
Planning one like it

Planning hotel millwork like this

Doors, bars and serving stations are all custom. Shop drawings are where the stain, fabric, trim and shapes get settled, and you approve them before anything is cut.

Our lead time is 8–12 weeks from approved drawings. The work is designed, fabricated and built in the USA in our Fort Lauderdale shop, and installed by our own crew.

More about our restaurant and hotel millwork

How it was built

  • Measured on site by us, then drawn for the client to approve before cutting
  • Designed, fabricated and built in the USA in our Fort Lauderdale shop, and installed by our own crew
  • We build our custom work with Columbia Forest PureBond plywood and Blum hardware. Where a project calls for other materials, we build to the approved spec.

Worth reading

4.8 stars from 87 Google reviews. Read selected reviews or see all 87 on Google.

FAQ

Questions about this hotel job

What did Delta Woodworks build for the Four Seasons Hotel at The Surf Club?

Hand-stained custom doors with inset fabric panels framed in metallic trim, dry bars for the hotel's cabanas, and rounded, painted serving stations for the hotel's restaurant.

Where was the work built?

Our custom work is designed, fabricated and built in the USA in our Fort Lauderdale shop, and our own crew installs it.

How long does a custom hotel millwork order take?

Our lead time is 8–12 weeks from approved drawings.