AC Hotel by Marriott Fort Lauderdale
Custom wall units, ice closets built to hide the hotel's ice machines, and outdoor storage units.
The job
At the AC Hotel by Marriott Fort Lauderdale, we built custom wall units, outdoor storage units, and custom ice closets made to hide the hotel's existing ice machines.
An ice closet is a custom enclosure that gives an existing ice machine a finished look while still letting staff and technicians reach it. The closet is built around the measured machine, not the other way around. The work was designed, fabricated and built in the USA in our Fort Lauderdale shop, and installed by our own crew. Lead time for custom work is 8–12 weeks from approved drawings. The photo at the top of this page shows a machine in our Fort Lauderdale mill, not the hotel.
For more planning detail, see our AC Hotel Fort Lauderdale millwork guide. We also build restaurant and hotel millwork for other hospitality projects — start on our restaurant and hotel millwork page or our commercial millwork page.
Project facts
| Location | Fort Lauderdale |
| Built | In our own Fort Lauderdale mill |
| Scope | Wall units, ice closets and outdoor storage units |
What we built
- Wall units. Custom wall units built to the hotel's drawings.
- Outdoor storage. Storage units built for outdoor use.
- Ice closets. Custom closets built to hide the hotel's existing ice machines.
Planning hotel millwork like this
Ice closets and other enclosures around existing equipment start with a site measure: the closet is built to the machine, its connections, clearances and service access, not the other way around.
Outdoor storage in South Florida has to deal with sun, salt air and humidity. Material and finish choices are set with the design team. Lead time is 8–12 weeks from approved drawings.
The work was designed, fabricated and built in the USA in our Fort Lauderdale shop, and installed by our own crew.
How it was built
- Measured on site by us, then drawn for the client to approve before cutting
- Designed, fabricated and built in the USA in our Fort Lauderdale shop, and installed by our own crew
- We build our custom work with Columbia Forest PureBond plywood and Blum hardware. Where a project calls for other materials, we build to the approved spec.
Worth reading
Other jobs like this one
4.8 stars from 87 Google reviews. Read selected reviews or see all 87 on Google.
Questions about this hotel job
What did Delta Woodworks build for the AC Hotel by Marriott Fort Lauderdale?
Custom wall units, outdoor storage units, and custom ice closets built to hide the hotel's existing ice machines.
What is an ice closet?
An ice closet is a custom enclosure built around an ice machine so the equipment is hidden, while staff and technicians can still reach it.
How long does a custom millwork order take?
Our lead time is 8–12 weeks from approved drawings.
Have drawings for a hotel job?
Send the plans or a floor plan, or call the shop to talk through scope and timing.