Delta Woodworks showroom at night, 2416 S Andrews Ave, Fort Lauderdale
Home / Blog / What happens at a custom cabinet measure and design visit
Planning

What happens at a custom cabinet measure and design visit

What we measure, what to have ready, condo extras and what you get after a custom cabinet, closet or vanity measure with Delta Woodworks in South Florida.

Every custom kitchen, closet, vanity or built-in we make starts the same way: we come out and measure the room ourselves. That visit decides how well everything fits, and a little preparation makes it quicker and more useful.

Before the visit

You don't need plans. If you have them, from an architect, a designer or a contractor, send them over; if you don't, we'll measure and design the whole thing for you. Either way, these help:

  • Photos and ideas. Screenshots, magazine pages, or photos of cabinets you like, including from our projects page.
  • Appliance and fixture models. Fridge, range, dishwasher, wine cooler, sinks and faucets. Cabinet openings are drawn to the maker's specs, so model numbers beat sizes.
  • What's staying and what's going. Flooring, windows, walls, plumbing and lighting that will move change the measurements.
  • Countertop plans. Stone, thickness and any waterfall ends. See planning cabinets around your countertops.
  • For a closet: a rough count of what it has to hold: long and short hanging, folded clothes, shoes and bags.

Want to see finishes and hardware first? Visit the showroom at 2416 S Andrews Ave, Fort Lauderdale, Monday to Friday 9 to 5, or Sunday and after hours by appointment.

What we measure

Walls in real houses are rarely straight, square or plumb, and ceilings and floors are rarely level. A custom cabinet is built to the room as it is, not as the plan says it is. A good measure covers:

  • Every wall length, at more than one height, and the ceiling height at several points.
  • Where the walls, floor and ceiling are out of square or out of level.
  • Windows, doors and their trim, and how far they open.
  • Outlets, switches, plumbing, vents, AC returns and anything else on the walls.
  • Soffits, beams, columns and bulkheads.
  • How the pieces get in: hallways, stairs, door widths and, in a condo, the elevator.

Condos and HOAs

In a high-rise, the visit itself often needs the building's permission, and so does the install. Ask management about renovation approval, certificates of insurance, elevator bookings and work hours before we come. We coordinate the install with your building management. Our condo guide covers the rest.

What you get after

From the measurements we draw the job and send drawings for your sign-off. Nothing is cut until you approve them. You'll see the layout, the sizes and where every door, drawer and appliance goes, and this is the stage to change anything. Once drawings are approved, the work is built in our own Fort Lauderdale mill; our standard lead time is 4–8 weeks. See how long custom cabinets take.

After drawings are approved, cabinets are built in our Fort Lauderdale mill.

Questions worth asking

  • Who will build it, and where? We build everything in our own mill and install with our own crew.
  • What are the boxes made of, and what hardware is used? Ours are Columbia Forest PureBond plywood with Blum soft-close hardware.
  • When will I see drawings, and what does the quote include?

More in questions to ask a custom cabinet maker. Ready to book? Get in touch or call 954-939-8579.

FAQ

Frequently asked questions

Do I need plans before you measure?

No. If you have plans, send them. If you don't, we measure the room and design it for you.

What should I have ready for the measure?

Photos of what you like, appliance and fixture model numbers, your countertop plans, and what's changing in the room. For a closet, a rough count of what it has to hold.

Why do you measure the room yourselves?

Real walls are rarely straight or square. Custom cabinets are built to the room as it is, so we take our own measurements.

What happens after the measure?

We send drawings for your sign-off. Nothing is cut until you approve them. Then it's built in our mill, with a standard lead time of 4–8 weeks.

Do condo measures need building approval?

Often, yes. Ask management about renovation approval, insurance certificates, elevator bookings and work hours before the visit.

Want a firm answer for your project?

We measure first, then quote from drawings. Call to set up a visit, or come by the showroom.